Difference between revisions of "Project schedule"

From Training Technology Lab Wiki
Jump to navigation Jump to search
Line 52: Line 52:
 
:-Verify the quality of the strain gauges.
 
:-Verify the quality of the strain gauges.
 
:-Get the offset and the rate of the strain gauges.
 
:-Get the offset and the rate of the strain gauges.
 +
:-Spend half to one hour to try to reconfigure the 'broken' ESC.
 
|
 
|
 
;Jet Bike
 
;Jet Bike

Revision as of 07:53, 22 February 2019

Schedule
Who Date Project / activity

(List your project with title and a short presentation)

Next step

Short description of the milestone for next week Ongoing work - short status

Anders B Week 8 (18/2-2019)
Sportssensor
-Write driver for new Winbond W25N01G flash memory (70% done)
Bike
-Emergency stop
-Throttle input from user
-Speedsensor
-Strainggauge
-Streaming
Academic
-Prep for ROS article w. Beck
Library information search course (20/2)
-12:30 to 15:00 in Ø1-502-2
Sportssensor
-Complete formatting routine.
-Test new driver code before releasing to students.
-Solder batteries to ~10 new sensors.
Bike
-Adapt code and sensor interfacing from early mucykel prototype
-Talk to Allan from workshop after wednesday regarding weight optimisation.
-Talk to Cao about 3D printed potmeter holder for steering bar.
Academic
-Read ROS articles on Mendeley
Library information search course (20/2)
-Send reminder mail to ESRL list.
Claes
Ying Week 8 (18/2-2019)
Jet Bike
-Assemble the 3D printed rack v1 and gain experiences.
-Improve the rack design, based on the experiences from v1, and satisfy its versatility for both bikes.
-Verify the quality of the strain gauges.
-Get the offset and the rate of the strain gauges.
-Spend half to one hour to try to reconfigure the 'broken' ESC.
Jet Bike
-3D Print the new design next Monday.
-Assemble the new design and gain new experiences.
-Test and control the new ESC (180A).
-Realize functions, such as turbine control, data collection, data log and GUI, on Raspberry Pi (ordered).
-Establish switch system.
-Design and assemble the racks for the speed measurement module & force control module.
Angelo